Skylab was maneuvered so its Apollo Telescope Mount (ATM) solar panels faced the Sun to provide as much electricity as possible. Because of the loss of the meteoroid shield, however, this positioning caused workshop temperatures to rise to 52 degrees Celsius (126 degrees F). The launch of Skylab 2 was postponed while NASA engineers, in an intensive 10-day period, developed procedures and trained the crew to make the workshop habitable. At the same time, engineers "rolled" Skylab to lower the temperature of the workshop.
Return to KSC Home Page Return to Skylab Page
__________________________________________________________________
Last Updated Fri Aug 25 11:16:09 EDT 2000 Jim Dumoulin (Redacted)